These equipments let to measure the pass and contact voltages that
can generate because of break-down current that interest plant of earth.
Their realization is such to satisfy in ambit of their services norms IEC 11-8 "rules for earthing
plants".
Such equipments are composed of 3
sectors:
Our production consents to reach a maximum voltage test, like in force
norms, of
1000 V with a power of 95 kVA
The
command of this equipment can be direct from the control desk or through a
radiocontroller system.